AttractionIndustrial/Convention facilityGunsan City 비응도동
Bieungdo Wind Farm
Bieungdo Wind Farm is a wind power site in Gunsan with 10 wind turbines in all: 6 of the 750 kW class and 4 of the 850 kW class. Its total capacity is 7.9 MW, and it cost 16,100,000,000 won to install.
How many turbines Bieungdo Wind Farm has and its total capacity
Bieungdo Wind Farm has 10 wind turbines. By capacity, there are 6 of 750 kW and 4 of 850 kW, and the whole site's capacity is 7.9 MW. Installation cost 16,100,000,000 won in total, and the power it produces in a year is worth about 900,000,000 won.
How Bieungdo Wind Farm makes power and the wind it needs (an average of 4 m per second or more)
The wind turbines at Bieungdo Wind Farm make electricity from the turning force created when the wind spins the blades. Wind power needs an average wind speed of 4 m per second or more. Output rises as the wind gets stronger and as the turbine gets larger.
Viewing hours and accessibility at Bieungdo Wind Farm
You can look around Bieungdo Wind Farm 24 hours a day, with no closing days all year. The site has no accessible parking and no accessible restroom, and wheelchairs are not available to borrow.
FAQ
How many turbines does Bieungdo Wind Farm have?
Bieungdo Wind Farm has 10 wind turbines. There are 6 of 750 kW and 4 of 850 kW, for a total capacity of 7.9 MW.
Can I visit Bieungdo Wind Farm at night?
Yes. Bieungdo Wind Farm is open 24 hours a day, with no closing days all year.
How much did Bieungdo Wind Farm cost to install?
Installing Bieungdo Wind Farm cost 16,100,000,000 won in total. The power its turbines produce in a year is worth about 900,000,000 won.